Pipeline Identification Tape (PLI)
-
Roll length: 33m
-
All pipeline tapes are on laminated tape.
-
Pipeline tapes are printed either across or along the tape - as stated by each text.
-
All pipeline tapes are printed positive unless otherwise stated.
Text/Width
F 25mm across
F 50mm across
F 75mm along
F 150mm along
FA 50mm across
Fail 50mm along
Fat 100mm across reverse
FCW 50mm across
Feed 50mm across
Feed 50mm across
Feed Discharge (2 lines) 50mm along
Feed Gas 25mm along
Feed Water (2 lines) 38mm across
FG Fuel Gas 75mm along
FH HP Fire Water 75mm along
Final Effluent Service Water 50mm across (2 lines)
Finings 100mm across
Fin Product 100mm across
Filler 50mm across
Filtered Beer (2 lines) 50mm across
Filtered Water (2 lines) 50mm across
Filtered Water (2 lines) 75mm across
Filtered Water 150mm across
Fire 50mm across
Fire 50mm across reverse
Fire 50mm across
Fire Air Fire 100mm across
Fire Alarm (2 lines) 50mm across reverse
Fire Alarm Cable 50mm across
Fire Alarm System 50mm across
Fire Extinguisher 50mm across reverse
Fire Extinguisher 100mm across
Fire Extinguishing 100mm across
Fire Extinguisher Water (2 lines) 50mm across
Fire Extinguisher Water (2 lines) 50mm across reverse
Fire Extinguishing Water 25mm along
Fire Extinguishing Water (2 lines) 50mm across reverse
Fire Extinguishing Water (2 lines) 150mm across reverse
Fire Extinguishing Water 150mm across
Fire Fighting (2 lines) 50mm along
Fire Fighting Use Only (2 lines) 50mm across reverse
Fire Fighting Water 150mm across
Fire Hose 50mm across
Fire Hydrant 100mm across reverse
Fire Main 25mm along
Fire Main Fireman 50mm across
Fire Main 50mm across
Fire Main (2 lines) 50mm across
Fire Main 50mm along
Fire Main (2 lines) 150mm across
Fire Main 150mm across
Fire Service (2 lines) 50mm across
Fire Service (2 lines) 50mm across
Fire Service 150mm across
Fire Service (2 lines) 150mm across
Fire (W) (2 lines) 150mm across
Fire Water 50mm along
Fire Water 100mm across
First Stage (2 lines) 38mm across
Flammable Gases Mix 150mm across
Flammable Vent Header (2 lines) 100mm across
Flare Line 50mm along
FL LP Fire Water 75mm along
Flour 100mm across
Flow 50mm across
Flow 75mm along
Flow 100mm across
Flow 100mm across
Flow (10mm letters) 50mm across
Flow In (2 lines) 75mm across
Flow Out (2 lines) 75mm across
Flow Input 25mm along
Flow Output 25mm along
Flow Input 50mm across
Flow output 50mm across
Flow Input 150mm across
Flow Output 150mm across
Flume Flush Water (2 lines) 50mm across
Flushing 150mm across reverse
FM 50mm across
FO 50mm across
Foam 25mm along
Foam Line 50mm along
FOB 50mm across
F Oil 100mm across
Formaldehyde 50mm across reverse
Formic Acid (2 lines) 50mm across
Forming 50mm across
Forming 50mm across
Forming Gas (2 lines) 50mm across
Fortified Acid 150mm across
FP 38mm across
FP 100mm across
Freon 50mm across
Freon 100mm across
Fresh 38mm along
Fresh Air 150mm across reverse
Fresh Water (2 lines) 50mm across
Fresh Water (2 lines) 50mm across
Fresh Water (2 lines) 50mm across
Fresh Water 150mm across
From 50mm across
F Tank 150mm across reverse
Fuel Avtag (2 lines) 50mm across reverse
Fuel Avtar (2 lines) 50mm across reverse
Fuel Gas 25mm along
Fuel Gas 25mm across
Fuel Gas 50mm along
Fuel Gas 50mm across
Fuel Gas 50mm across
Fuel Gas 50mm along
Fuel Gas - GF 25mm along
Fuel Oil 25mm along
Fuel Oil 35mm across reverse
Fuel Oil 50mm across reverse
Fuel Oil 50mm across
Fuel Oil 50mm along
Fuel Gas (specials) 25mm along
Fuel Oil 100mm across
Fuel Oil 100mm across reverse
Fuel Oil 150mm across reverse
Fuel Oil 1 50mm across
Fuel Oil 2 50mm across
Fuel Oil Heavy 50mm along
Fuel Oil Heavy 150mm across reverse
Fuel Oil Light 50mm along
Fuel Oil Light 150mm across reverse
Fuel Oil Med 150mm across reverse
Fuel Supply 25mm along
Full 25mm along
Furnace Oil 25mm along
FVC 75mm across
FW 50mm along (45mm high)
FW Sprinkler Water 75mm along |